Monday, May 26, 2025

ONGC-Invenire JV resumes crude oil production at PY-3 offshore field after 13-year hiatus

The PY-3 Field, located off the east coast of India, was first brought on-stream in 1997 and had been shut since July 2011. The field is being developed under a Joint Venture (JV) comprising ONGC with a 50.63 per cent participating interest, Hardy Exploration with an effective 22.79 per cent, and Invenire Petrodyne holding 26.58 per cent.

from Top Energy News | Latest Energy Industry Information and Updates: ET EnergyWorld : ETEnergyworld.com https://ift.tt/xS9hTFX

No comments:

Post a Comment