The project was commissioned in phases, with the final 25 MW commissioned in Cachar. The power generated by the plant is being supplied to Assam Power Distribution Company Limited under a long term 25-year PPA at a tariff of INR 3.34 (~US 4.4 cents) per KWh.
from Top Energy News | Latest Energy Industry Information and Updates: ET EnergyWorld : ETEnergyworld.com https://ift.tt/j2RCB5k
No comments:
Post a Comment