Friday, March 3, 2023

Green energy obligation for coal-based plants notified

"It has been decided that any generating company establishing a coal/lignite-based thermal generating station and having the COD of the project on or after 1stApril 2023 shall be required to establish renewable energy generating capacity of a minimum of 40% of the capacity of a coal/lignite-based thermal generating station," the notification read.

from Energy-Industry-Economic Times https://ift.tt/Ec2rKxu

No comments:

Post a Comment