“CIL’s urgency in shoring up supplies to power plants was evidenced in 104% materialization during the last week of August at an average per day supply of 1.36 MTs against the requirement of 1.31 MTs given by CEA. The last three-day average loading to power went up to 1.4 MTs,” said a senior executive of the company.
from Energy-Industry-Economic Times https://ift.tt/3zGhdnJ
No comments:
Post a Comment