Regulation of coal supply to power plants to free up 1.77 lakh tonnes: Power ministry
The second unit of NTPC Daralipali will achieve commercial operation from 0000 hrs of September 1, and thus additional 800 megawatt (MW) generation would be added in the total fleet.
from Energy-Industry-Economic Times https://ift.tt/3zEk4xm
No comments:
Post a Comment