Lt Governor R K Mathur said the intra-state transmission works have been sanctioned by the Union Ministry of Power and include 220 KV S/C transmission lines of D/C tower (total 307 km), including Kargil-Padum (Zanskar) (207 km) and Phyang to Diskit (Nubra) (100 km) and two 220/33 KV Grid substation.
from Energy-Industry-Economic Times https://ift.tt/2SHO8ba
No comments:
Post a Comment