Monday, April 19, 2021

NTPC makes 85 Mw Bilhaur solar project commercially operational

With this, the total installed capacity of NTPC and NTPC group is now 52400 MW and 65825 MW, respectively.

from Top Energy News | Latest Energy Industry Information and Updates: ET EnergyWorld : ETEnergyworld.com https://ift.tt/3x8eYsC

No comments:

Post a Comment