Friday, August 14, 2020

MNRE setting up wind-solar hybrid parks to overcome land and connectivity bottlenecks

The Ministry of New and Renewable Energy has identified 10 areas where hybrid wind-solar parks can be set up. With this, it hopes to resolve two of the biggest issues troubling the wind industry - that of land and connectivity.

from Energy-Industry-Economic Times https://ift.tt/3avxUGL

No comments:

Post a Comment