Monday, July 20, 2020

National Thermal Power Corporation's total installed capacity reaches 62910 MW

The unit-2 of 800 MW of Lara Super Thermal Power Project has been added to installed Capacity of NTPC on successful completion of trial operation, an official statement said. "With this, the total installed capacity of NTPC and NTPC group has become 51155 MW and 62910 MW respectively," it said.

from Energy-Industry-Economic Times https://ift.tt/3jxTuyC

No comments:

Post a Comment