Though a 10 MW project was proposed to be commissioned, only 6 number of windmills each of 1.25 MW, totalling 7.5 MW capacity could be commissioned by Suzlon, following roadblocks in getting the required land from the AP forest department
from Top Energy News | Latest Energy Industry Information and Updates: ET EnergyWorld : ETEnergyworld.com https://ift.tt/312uiHu
No comments:
Post a Comment