Tuesday, December 24, 2019

BHEL commissions first lignite-based 500 mw thermal Unit

BHEL's scope of work includes design, engineering, manufacture, supply, erection, testing and commissioning along with associated civil works of boiler, turbine and generator and associated auxiliaries along with electricals.

from Energy-Industry-Economic Times https://ift.tt/2rmJkug

No comments:

Post a Comment