With this, the total installed capacity of NTPC and NTPC Group has become 48,895 MW and 57,356 MW, respectively, a company statement said. "...250 MW unit of Barauni thermal power station has been added to installed capacity of NTPC on successful completion of trial operation," it said.
from Energy-Industry-Economic Times https://ift.tt/34zWzpK
No comments:
Post a Comment