Sunday, December 23, 2018

Azure power qualifies for technical round, government discussing tariff

Solar Energy Corporation of India (SECI) floated a 10 GW solar tender in May, linked with 5 GW manufacturing capacity, which was later brought down to 3 GW.

from Energy-Industry-Economic Times http://bit.ly/2Rd5UQT

No comments:

Post a Comment