
Projects with a total capacity of 15.3 GW were sanctioned during the first half of the year, the study said. The collaboration between IEA and CEEW tracks the renewable energy sector at the project level, and takes a look at the financing trends as well.
from Energy-Industry-Economic Times https://ift.tt/2TZh3on
No comments:
Post a Comment