Friday, April 10, 2020

Six missing after power plant dyke gives way

Five villagers and a worker at the site owned by Reliance Power were swept up in a flow of fly ash which travelled at least six kilometres, swallowing up whole agricultural fields along the way.

from Energy-Industry-Economic Times https://ift.tt/2VhUYBO

No comments:

Post a Comment