Thursday, April 16, 2020

COVID-19: Power ministry asks state authorities to ensure smooth movement of raw materials for power supply

These materials are required during the lockdown period as the existing stocks will not last till lifting of the declared lock down period

from Top Energy News | Latest Energy Industry Information and Updates: ET EnergyWorld : ETEnergyworld.com https://ift.tt/2RHPyiw

No comments:

Post a Comment